Seattle, WA building permits with contractor name
Seattle, Washington. Measured on 17 September 2026 on real rows from the official register, not from its documentation.
What the Seattle permit register publishes
| Register | Permits / month | Contractor | Phone | License no. | Job value | GPS |
|---|---|---|---|---|---|---|
| City of Seattle building and trade permits | 1,847 | 58% | 0% | 0% | 98% | 100% |
This register has no phone column at all. The feed gives you the business name; with the Google Maps enrichment on, the run looks each contractor up and fills the phone and website where the name matches (measured in Seattle on 22 September 2026: 16 of 33 contractors matched, a phone on 55 of 80 permits that had none; Chicago 7 of 40).
Three real permits from the Seattle register
| Issued | Trade | Work | Address | Value | Contractor | Phone |
|---|---|---|---|---|---|---|
| 2026-09-21 | hvac | Boiler installation | 5427 40th Ave SW | $5,500 | Green City Heating and Air Conditioning | — |
| 2026-09-21 | other | New installation of Garaventa Genesis VPL. Replacing the existing lift that was removed un | 1046 1st Ave S | $24,750 | Mobility Concepts Inc | — |
| 2026-09-21 | other | Modernization Installing new Controller, Rope Gripper, Car /Counterweight roller assemblie | 1700 Westlake Ave N | $70,000 | Elevator Support Company LLC | — |
Issued on 2026-09-21, pulled from the register on 2026-09-23.
How to get the Seattle permit feed
One run delivers the permits issued in the last N days, one row per permit, classified by trade (roofing, solar, HVAC, electrical, plumbing, remodel, new construction, demolition, pool, fence), with a lead score and a lead window. Delta mode remembers what it already sent, so a daily schedule only pays for new permits.
Run US Building Permits on Apify $0.005 per permit, first run costs cents
{
"cities": [
"seattle"
],
"lastNDays": 7,
"trades": [
"roofing",
"solar",
"hvac"
],
"onlyNew": true
}
Two more stages of the same permit, which few other feeds sell. Same input plus the stage:
- Permit applications, the lead 4 to 10 weeks before the permit is issued:
stage: "applied". - Completed work, the final inspection passed and someone moves in:
stage: "completed".