New Orleans, LA building permits with contractor name and license
New Orleans, Louisiana. Measured on 17 September 2026 on real rows from the official register, not from its documentation.
What the New Orleans permit register publishes
| Register | Permits / month | Contractor | Phone | License no. | Job value | GPS |
|---|---|---|---|---|---|---|
| City of New Orleans permit register | 1,492 | 80% | 0% | 77% | 60% | 0% |
This register has no phone column at all. The feed gives you the business name and license number; with the Google Maps enrichment on, the run looks each contractor up and fills the phone and website where the name matches (measured in Seattle on 22 September 2026: 16 of 33 contractors matched, a phone on 55 of 80 permits that had none; Chicago 7 of 40).
Three real permits from the New Orleans register
| Issued | Trade | Work | Address | Value | Contractor | Phone |
|---|---|---|---|---|---|---|
| 2026-09-16 | plumbing | rough-in for renovation | 4318 Mendez St | — | John T Watson | — |
| 2026-09-16 | remodel | Non Structural Renovation: Repair and/or replace damaged sheetrock, painting, replace floo | 2013 Conti St | $5,500 | Milton Goines | — |
| 2026-09-16 | electrical | Complete Electrical Rewire of existing church. New electrical service and branch circuits. | 600 New Orleans-Hammond Hwy | $31,023 | Barry Joseph Sorrell | — |
Issued on 2026-09-16, pulled from the register on 2026-09-23.
How to get the New Orleans permit feed
One run delivers the permits issued in the last N days, one row per permit, classified by trade (roofing, solar, HVAC, electrical, plumbing, remodel, new construction, demolition, pool, fence), with a lead score and a lead window. Delta mode remembers what it already sent, so a daily schedule only pays for new permits.
Run US Building Permits on Apify $0.005 per permit, first run costs cents
{
"cities": [
"new_orleans"
],
"lastNDays": 7,
"trades": [
"roofing",
"solar",
"hvac"
],
"onlyNew": true
}
Two more stages of the same permit, which few other feeds sell. Same input plus the stage:
- Permit applications, the lead 4 to 10 weeks before the permit is issued:
stage: "applied". - Completed work, the final inspection passed and someone moves in:
stage: "completed".